BOQ / Pilot 1 Commitments 2026-05-12
Contract checkpoint

Pilot 1 Commitments

Date: 2026-05-12
Parties: BOQ (Brad Poirier) / Online Optimisers (Donal) / ONE Infrastructure (Tony O'Connell)

Status keys: landed = shipped, runnable today / scaffolded = code exists, not production-hardened / designed = spec exists, no code / not built = neither.

Pilot 1 is the first 50 paying clients, run over 6 weeks, ending in a single decision gate with three measured pass conditions. The gate determines whether we ramp to Pilot 2 (200-500 clients) or hold the cohort, keep collecting revenue, and course-correct. This sheet is the load-bearing reference document for that gate. The NewCo / JV memo points back to these exact criteria.

Scope, Duration, Gate

CohortFirst 50 paying BOQ clients
Duration6 weeks from kickoff date
GateSingle review at week 6, three pass conditions, all required
Gate / 3 conditions, all required
Pass condition 1
Conversion
>= 1% of bot conversations close an action (booking, lead capture, payment, qualified handoff). Niche-specific definition agreed in writing before kickoff.
Pass condition 2
Churn
<= 8% across the 50-client cohort over 6 weeks
Pass condition 3
COGS
Modal client all-in <= $45/mo, heavy <= $63/mo, no client breaches the per-workspace daily cost cap
Pass all three Ramp to Pilot 2 (200-500 clients)
Miss any one No ramp. Cohort keeps earning. Tony and Donal course-correct on the failing condition before re-gate.

You can verify each condition independently: conversion from the workspace dashboard, churn from Stripe, COGS from the credit-burn ledger.

What Ships in Pilot 1

DeliverableStatus entering Pilot 1Pilot 1 commitment
7 production-grade niche ICP packsnot builtAll 7 authored and live before client #1
Niche-pack authoring kitdesignedDonal can author packs without engineering touch
Workspace dashboard UI (per wireframe)designedBuilt to spec: three-column, KPI strip, edit-mode, role permissions
Per-workspace daily token budget + cost capdesignedLive before client #100. Hard breaker at 2x cap.
CMS connector: Static HTMLscaffoldedProduction-hardened
CMS connector: ShopifyOAuth landedConnector live (Composio + auth-config)
CMS connector: WebflowOAuth landedConnector live (Composio + auth-config)
CMS connector: WordPressnot builtNative REST connector live
Customer-facing audit timeline UInot builtLive, 90-day retention configured
7-ICP classifier, 0.85 confidence thresholdscaffoldedThreshold raised, sub-threshold routed to Philippines fallback queue
Element-edit pipeline wired to live CMSesdemo onlyWired to the 4 Pilot 1 connectors above
Stripe production-hardening at 50+ concurrent renewalsscaffoldedHardened: failure modes, idempotent webhooks, dispute handling

Deferred to Pilot 2

These are explicitly out of scope for Pilot 1. Naming them now so nothing is implied:

Substrate Brad Inherits on Day 1

Already landed. Not Pilot 1 work, not Pilot 2 work. Live in production today and forkable:

Mutual Commitments

BOQ (Brad)

  • Surface first 50 client names + niche mix before kickoff
  • Agree the niche-specific conversion definition in writing pre-kickoff
  • Pay the $4k retainer per the contract
  • Co-sign the week-6 gate decision

Online Optimisers (Donal)

  • Run client-facing relationship + niche-pack QA
  • Review and pre-edit the 7 niche-pack opening prompts
  • Author additional niche packs using the authoring kit
  • Co-sign the week-6 gate decision

ONE (Tony)

  • Ship the technical deliverables in the table above
  • Deliver weekly status against the gate metrics
  • Source-code escrow for the product layer (NCC Group or equivalent)
  • Co-sign the week-6 gate decision

What Happens at the Gate

Week 6 review. One meeting. Three numbers on the table.

Full pass

All 3 conditions met

Ramp to Pilot 2 (200-500 clients). Written SLA work begins. Wix / GHL / WooCommerce connectors enter build.

Partial pass (2 of 3)

One condition missed

No ramp. 2-week course-correction sprint on the failing metric. Re-gate at week 8. Cohort keeps earning.

Hard miss (2+ conditions missed)

Two or more missed

No ramp. Full pause. Tony + Donal + Brad sit down. Decide: re-scope Pilot 1, extend, or restructure.

In every outcome, the 50-client cohort keeps running and keeps earning. No client is shut off based on the gate. The gate decides what happens next, not what happens to the cohort.

Sign-off

This sheet is the source of truth for the Pilot 1 contract checkpoint. Changes require all three signatures.

BOQ
Brad Poirier
Signature
Date
Online Optimisers
Donal
Signature
Date
ONE Infrastructure
Tony O'Connell
Signature
Date
Kickoff date (filled at sign-off)
Week-6 gate date (kickoff + 42 days)